Unable To Change Order Of Icons In Quick Launch Taskbar?
Jul 4, 2005
Have XP Home Edition with all current updates. Do not have toolbars locked. By mistake, moved the whole Quick Launch Taskbar and lost it. When I went to Start > Properties > and enabled Show Quick Launch, I got it back with all my icons. The problem is that they are no longer displayed in the order that I want and I can not drag them to change the order. Sometime in the past, I was able to drag them to change their rder. Again, I do not have the toolbars lock set. I went to my application dataMicrosoftIEQuick Launch and changed the sort order of the folder but it did not change the
display order when I rebooted the system.
View 7 Replies
ADVERTISEMENT
Jul 14, 2005
I switched on my PC one day and the quick launch icons on the left of my taskbar had gone. I right-clicked the taskbar and selected "toolbars" and "quick launch" and this brought back the quick launch icons but doubled the size of my task bar and it will not reduce to its normal size unless I remove quick launch from the toolbars menu.I then tried to drag shortcuts from the desktop to the taskbar, which is how I had originally got the quick launch icons I wanted, but they would not attach to the taskbar.I have made no recent changes of any kind.
View 7 Replies
View Related
Jun 8, 2005
I normally use a single-height taskbar. But everytime I add the Quick Launch toolbar to the taskbar, the taskbar doubles in height. I tried grabbing the dividers and sliding them, but they don't move.
View 6 Replies
View Related
Aug 1, 2005
I think all of this started after I downloaded some windows updates, and it stopped making anything on my quick launch menu to work. So I deleted most of them, but kept show desktop and outlook express. I fiddled with the toolbar settings (address, links, windows media player etc.)and now I've lost my quick launch option entirely! everytime I try to check that toolbar, it closes the menu and nothing happens. How do I get quick launch back?
View 7 Replies
View Related
Nov 16, 2006
All of a sudden, the bar (called Taskbar?) with the Start button, Time, and other Quick-Launch icons is on top of the screen and there is no way to move it back to the bottom!I have Windows 2000 Version 5.0.
View 7 Replies
View Related
Aug 18, 2005
Hi! After running a program called System Mechanic from Iolo technologies I discovered my computer had stopped working properly and kept telling me that files essential to the smooth running of windows had been changed. I did a system restore operation and almost everything went back to normal. The only exception is my desktop icons, and icons on the quick lanch bar. They're appearing inside white squares and not against the desktop wallpaper like they should almost as if the wallpaper has not loaded properly under the
icons
View 1 Replies
View Related
Feb 27, 2005
i tried to move firefox (safemode) to my quick launch bar and 2 things were created, a shortcut and something else. i deleted the shortcut but i can delete the other one. heres what it says.
cannot delete file: cannot read from the source file or disk
how do i remove this icon?
View 1 Replies
View Related
Apr 19, 2005
Someone at work deleted my Quick Launch Button which is located at the bottom of the taskbar (also called Show Desktop button).. My quick launch tab is checked so it's not that. How do I get my Quick Launch Button back? I don't know how anyone can function without that Button.. I love that button! I Right Mouse the taskbar.. go to Toolbars and yes that Quick Launch Tab is checked.. they actually removed it and deleted it..
View 5 Replies
View Related
Sep 23, 2007
I have just got another computer running XP home. I am not able to drag and drop a shortcut to the quicklaunch bar. And yes I have the bar unlocked and quicklaunch checked. I can't imagine why I don't have this function. When I drag to the quicklaunch bar I don't see the usual black line on the left of the icon.I can drag and drop on the desktop all day. Any suggestion as to what the problem might be? I have never had this problem in eight years I have had a computer.
View 4 Replies
View Related
Mar 1, 2006
My quick launch toolbar is showing only 3 programmes. If I want to see more programmes of quick lauch bar. I have to click the small arrow on quick launch bar( see the first and second attachements with my post). I want to know is there some way that I can see more than just 3 progeammes on this bar without clicking the arrow? Secondly can I choose which programmes to appear all the time on quick launch bar( see first attachement) and which programmes should be hidden and will only appear when I click the small arrow( see second attachement).
View 24 Replies
View Related
Aug 13, 2005
Just reinstalled XP Pro on my laptop (ATI graphics), and have set the taskbar settings to small icons. The quicklaunch buttons, for some reason, are disproportionately large,though.I know that before they were nice and tidy (before I had to reinstall), so know that it IS possible to have something that takes less space than these do. Is there some separate setting somewhere else for quicklaunch button size that I am missing?
View 9 Replies
View Related
Jun 7, 2004
Previously I had my computer setup so that the QUICK LAUNCH toolbar would display program icons when my computer was started. Now, whenever I reboot, the toolbar disappears and I have to right click on the task bar, select toolbars, and select Quick Launch. Any ideas why this may be happening or how to prevent this from being removed each time. I tried locking the taskbar, but that didn't help.
View 14 Replies
View Related
Dec 23, 2004
i just installed windows xp and my quick launch buttons are about 4 times the size they should be is this new in sp2? can i change it? because it's really annoying
View 6 Replies
View Related
Mar 27, 2008
Now the quick launch buttons are on bottom and the current windows are on top. How do I get it back to where both are on the same bar
View 7 Replies
View Related
Jul 3, 2005
What do I need to do to remove an icon for a disabled program from the Quick Launch bar?
View 4 Replies
View Related
Dec 3, 2007
I lost my Quick launch desktop button. what do i do?
View 12 Replies
View Related
May 22, 2007
I recently had to restore a mail folder for my Thunderbird application for a deleted account.So I accidentally made my entire application data folder visible (not hidden).Since then, an application called Quick Launch appears in the Applications pane of the Task manager that I can't kill.My understanding was that it was just a toolbar folder in the Application data folder. Every time I go full screen in WMP and come out, a little Quick Launch window minimizes itself to the bottom right of the taskbar.
View 4 Replies
View Related
Jul 22, 2006
My Ghost 10 'quick launch icon' has disappeared? I opened the program/options/tray icon/enabled 'show system icon' rebooted, but it still is not there?Could a registry cleaner be responsible for this I wonder?
View 16 Replies
View Related
Oct 19, 2007
I recently have lost my quick launch feature on the task bar. Also when right clicking on the task bar my toolbar option is no longer available. Trying to retrace what I could have done lately but only remember playing with UI themes.
View 5 Replies
View Related
Apr 25, 2006
I was on my computer yesterday, and all of a sudden, my quick launch buttons are gone, and the accessories option from my start menu is gone (you know, the one the has system tools, volume control, calculator, and all that under it) I don't know what happened!
View 14 Replies
View Related
May 11, 2009
I had to have Windows XP installed because it had gotten corrupted and now I'm having a problem with the Icons on the taskbar hiding.I made sure that the Lock The Taskbar option is checked but its still hiding icons. How do I fix this????
View 3 Replies
View Related
Sep 1, 2005
I want a single desktop click to enable/disable windows XP taskbar auto hide.I can do this if I write a script for the AutoHotkey macro tool to open the relevant dialog box and then check or uncheck the appropriate check box.I'd like to open the dialog box with a command line from AutoHotkey, or a similar operation. Right-clicking the taskbar even in the program is uncool.The catch is, I can execute any CP dialog EXCEPT this one as a command line, either passing a dialog parameter to Control.exe or else using a *.cpl file name with Control.exe or directly. But I can't find "Taskbar and Start Menu".
View 1 Replies
View Related
Oct 14, 2006
I have finally decided to put my screen settings to 1024-768 or what ever that one is lol .. but my only problem now is the font size.. for example up top of this page where it says file,edit, view etc..is really small and same as the name thats down on my bar at the bottom of my screen where my open windows are they are really small and I want to make them bigger how do I do that? also .. my quick launch icons are super small can I make them bigger? I made the ones on my desktop bigger but can't figure out how to make the quick launch ones bigger.
View 4 Replies
View Related
May 20, 2006
I have discovered that I am no longer able to change the colors of the icons on my desktop. When I get to that option in the Display Properties menu, the option is there but it is not active, it is grayed out or in this case beiged out. I am running XP Professional.
View 7 Replies
View Related
Jul 15, 2005
There are numerous applications such as McAfee, etc. and other McAfee components in the startup, my question is, can you change their order in startup and therefore control which ones activate first to last? And by doing this can or would you be able to improve any amount of the startup performance?
View 3 Replies
View Related
Nov 7, 2008
fitted a new hard drive due to virus and want to reinstall windows but went into bios to change boot order but it wont let me it has enter in red alongside all i can do is press it it wont let me go anywhere else.
View 7 Replies
View Related
Oct 26, 2007
I am receiving the error message about missing or corrupt file and have seen many "fixes" posted on the web. But my trouble is a little different. I have the XP install DVD and when I put it in the computer and start it up it doesn't do anything different, i have tried to change the boot setup (F12 i think upon startup) and try to prioritize it to the number one spot, but it doesn't save the change (although it does look like the drive light is on during startup. I can't boot it up in Safe Mode or any of the options that appear on that screen. Everything I try takes me back to the black screen that says something along the lines of insert the original install disk and press R to go to the restore menu. I cant' get the thing to boot from the DVD. To note - on the screen where you can change the boot order, it doesn't say DVD drive it says CD but the drive came with the computer.
View 1 Replies
View Related
Dec 16, 2006
I right clicked on the Taskbar and checked Quick Launch and hit the Apply button. This put the Quick Launch toolbar on the Taskbar with the Show Desktop and Internet Explorer icons. I deleted them and now I can't duplicate this action. I can get the Internet Explorer icon back. But I can't get the Show Desktop icon back.
View 1 Replies
View Related
Aug 12, 2002
Not sure if this is really considered a tweak or useful but I love it and everyone i show it to does also. Works on 98se to XP.Create a new folder of any name in my Documents, now put any shortcut to a program you would like. Drag the folder drom the DOCument folder onto your task bar where your clock is. Now you have a customized quick folder for accessing programs on the fly without the clutter of desktop icons
View 9 Replies
View Related
Aug 25, 2008
Just wondering?? Is there a way to set the order in which items start when I start my computer. The items in the notification tray are what I am talking about. Is it possable to get things to pop into that area in a different order?
View 6 Replies
View Related
Aug 5, 2007
It doesn't seem like any of the posts that I've seen have the same detailed characteristics as my situation. Whenever my computer is started and logged on, a few minutes go by, then the message "unable to launch restart.exe" pops up. Once we hit the OK button, everything seems to be fine. So it's not a big problem, but it's kind of a nuisance.
As I said previously, I have read MANY other posts regarding this error, but it seems everyone was having much more serious problems regarding this message. This computer seems to run just fine after we hit the OK button on the error message. FYI... this is an HP computer, running XP Home Edition, P4 2.93 Ghz, 1 Gig ram, Ad-aware is installed, and Norton Internet Security 2006, both of which are fully up-to-date and scans have been performed. All standard windows disk utilities have also been run. I don't know what else is appropriate to tell you. I do have Hijack This installed and have run it once... but at the time I wasn't registered for any of these help forums. If needed I can run it again and save the log file for someone to assist me.
View 9 Replies
View Related