Change Order In Startup
Jul 15, 2005
There are numerous applications such as McAfee, etc. and other McAfee components in the startup, my question is, can you change their order in startup and therefore control which ones activate first to last? And by doing this can or would you be able to improve any amount of the startup performance?
View 3 Replies
ADVERTISEMENT
Nov 7, 2008
fitted a new hard drive due to virus and want to reinstall windows but went into bios to change boot order but it wont let me it has enter in red alongside all i can do is press it it wont let me go anywhere else.
View 7 Replies
View Related
May 4, 2006
How do I set the order of startup with the modules that load on the right side of desktop next to the clock? I would like to control in what order thoese modules load on the desktop when a user logs in.
View 3 Replies
View Related
Oct 26, 2007
I am receiving the error message about missing or corrupt file and have seen many "fixes" posted on the web. But my trouble is a little different. I have the XP install DVD and when I put it in the computer and start it up it doesn't do anything different, i have tried to change the boot setup (F12 i think upon startup) and try to prioritize it to the number one spot, but it doesn't save the change (although it does look like the drive light is on during startup. I can't boot it up in Safe Mode or any of the options that appear on that screen. Everything I try takes me back to the black screen that says something along the lines of insert the original install disk and press R to go to the restore menu. I cant' get the thing to boot from the DVD. To note - on the screen where you can change the boot order, it doesn't say DVD drive it says CD but the drive came with the computer.
View 1 Replies
View Related
Jul 4, 2005
Have XP Home Edition with all current updates. Do not have toolbars locked. By mistake, moved the whole Quick Launch Taskbar and lost it. When I went to Start > Properties > and enabled Show Quick Launch, I got it back with all my icons. The problem is that they are no longer displayed in the order that I want and I can not drag them to change the order. Sometime in the past, I was able to drag them to change their rder. Again, I do not have the toolbars lock set. I went to my application dataMicrosoftIEQuick Launch and changed the sort order of the folder but it did not change the
display order when I rebooted the system.
View 7 Replies
View Related
Aug 25, 2008
Just wondering?? Is there a way to set the order in which items start when I start my computer. The items in the notification tray are what I am talking about. Is it possable to get things to pop into that area in a different order?
View 6 Replies
View Related
Nov 5, 2007
I have a HP ze5568cl laptop (Windows XP SP2). For a few years we've had trouble with the power connector. We've just wiggled the power cable to keep it connected and lived with the problem. It also gets very hot and the fan runs constantly. Yesterday when I powered it on there was no power, absolutely nothing. My husband has some electronic knowledge so we took the laptop apart and he soldered the loose part of the power connector. While he was doing that I cleaned the fan (couldn't believe how much dust was in there.When we plugged in the power cable the orange light came on so we were excited. When we powered it on all the keyboard lights lit up so we thought we had fixed the problem but.that's all it did. It went no further except that the fan kicked on.There is a clicking noise coming from the cd drive about every second with the green light flashing. I suppose it is checking to see if there is a bootable cd in the cd drive. I have attempted to change the boot order by holding F1, then F2 but it still continues to try to read the cd drive. I can't get to the screen that will allow me to change the boot order.
I also put the OS disk in the cd drive, hoping that it would start with the disk but it just clicks. Hubby removed the cover of the cd drive and I could see that the cd is spinning.There were no problems with this laptop prior to the power problem. It was really working very well especially considering the age of it.
The information in my sig is not for the computer with the problem. It's actually for an old computer which my son now has at college.
View 11 Replies
View Related
May 16, 2007
I want a program to run at startup and I want to be able to change what I have done at any time.
There are a number of unchecked entries in msconfig and I have to use Selective Startup all the time.
If I want to revert to Normal Startup under the General tab instead of Selective Startup, the program's box automatically rechecks itself in Startup.
The Startup tab gives me a handy record of what I did and allows for an easy change of mind so long as I continue to use Selective Startup.
If I edit the Registry to stop programs running at startup, they won't show in msconfig and I lose the handy record of how it was and I may have to reinstall the program to go back to it running at startup.
I would like to accomplish this:
1. Use Normal Startup instead of Selective Startup.
2. Have some programs not run at startup, but be able to easily change back to having them run at startup.
3. Have a readily accessible list of those programs and the details as shown under the Startup tab as a reminder of how it was without having to manually enter it all into a text file or keep a notebook or reinstall.
Is there some way to use Normal Startup, stop programs running at startup, but retain or find a list of those programs (including the details under the headings Startup Item, Command, Location) that is shown when using Selective Startup with unchecked boxes under the Startup tab?
To put it another way, use Normal Startup but somehow retain the convenient flexibility of Selective Startup.
View 7 Replies
View Related
Apr 28, 2007
I have a Windows XP Home installation and the main account is set as an administrator account.when we log into this account the command prompt window is displayed, but not with a c prompt and there is nothing we can do to exit it (i.e unable to type exit)
On looking at the startup options in msconfig, which is what's causing the command prompt window to open:
Startup Item: svchost
Command: C:windowssystem32driverssvchost.exe
Location: HKCUSOFTWAREMicrosoftWindowsCurrenVersionRun
So using the account that is in the administrators group I tried to deselect it but when clicking Ok or Apply I get this message:
Error: An Access Denied error was returned while attempting to change the service. You man need to log on using and Administrator account the make the specified changes.
But I am using an Admin account...!?!?
So I tried rebooting into safe mode, then as the 'Official' Admin account to change it but when I login as the Administrator the svchost isn't in the start up options?
There are a couple of other accounts that are just standard accounts and they don't have the svchost on their startup.
View 8 Replies
View Related
Feb 17, 2008
I changed from a domain to a workgroup on a work computer that stays at home, but remotely access the network via the internet. I had to reboot, however it turns out the account I was using is on the remote domain, so I cannot log in. I don't have the administrator password, and would like to somehow set the domain back to what it was earlier so I can log in again. How would I go about doing this?
View 3 Replies
View Related
Jun 12, 2005
Following a recent change of monitor my computer now hangs at the windows logo screen. It also hangs during startup in safe mode and when trying to boot fromthe windows CD.
View 6 Replies
View Related
Jul 28, 2007
My bro often uses my laptop, and changes startup applications by using msconfig key in start>run.I need a way to stop him from doing that.
View 14 Replies
View Related
Aug 18, 2006
What are the order of Windows Operating Systems after 98SE?
View 3 Replies
View Related
Dec 27, 2004
On my old coputer I could print documents so they came out with the first page on top. I ca not find how to make that happen on my new computer with XP.
View 4 Replies
View Related
May 27, 2005
Can any one let me know how to change the Name Resolution order in Windows NT4 please?
View 1 Replies
View Related
May 3, 2006
I want to split my existing Windows partition into three partitions:
1. Windows system + apps
2. Personal data
3. Swap file
My question is, is that the best order for them? Or should I keep the swapfile partition next to the system partition?I've heard some people say the swap partition should go on the outside of the disk, because it's the part that turns the fastest (so it has faster reads/writes). Or is that an urban legend?
View 9 Replies
View Related
Sep 15, 2007
My laptop came with one harddisk and a DVD drive. These were initially C and D drives.I later used a partition software and made 3 partitions out of my single harddisk. I meant to have these as C: (original drive), D:, and E: Drives. How can I change the oder/visible sequence of drives as per my requirements?
View 2 Replies
View Related
Apr 23, 2006
I recently added a 300 GB external USB2 hard drive to serve as a backup and general storage repository. Before connecting the drive, the system was booted. Once connected, the drive functioned flawlessly. However, after system shutdown the next boot failed with "no boot disk found," which was easily traced to the external drive.
View 9 Replies
View Related
Sep 10, 2005
I had a Thrustmaster Dual Power 4 game pad, and bought a Logitech Rumblepad later. I like the Rumblepad better, and want to consider it my "first string" controller. But if I go into say, Nba Live 2005, and go to choose controllers, no matter what I do, the thrustmaster is on the top of the list, and the logitech is on the bottom. All the old posts talk about choosing Preferred device in the control panel. By running DxDiag, I can see that setting something as the Preferred Device assigns it Controller ID 0. But I also see that the order of the Controllers, as recognized by most games, is the same as the order listed in the game controller control panel, and is completely unrelated to which device is "controller id 0" and "preferred device." For example, I set the logitech as preferred device, and plugged in the thrustmaster and also a gamepad pro.
View 4 Replies
View Related
Aug 16, 2005
When i go to open or save a file, the windows always return to reverse alphabetical order, how can i change this default back to alphabetical order?
View 1 Replies
View Related
Jul 17, 2005
I like to think I know my way around a pc but XP has humbled me.By humbled I mean been driven INSANE. I have 2 big problems that I just can't seem to figure out how to fix/why it happens and one little problem. Any help is greatly appreciated. If you need screenshots, blood, whatever, let me know and I'll give it if it gets me down the path to fixing these maddening problems.
View 1 Replies
View Related
Sep 18, 2007
The hard drive on my five-year old Dell crashed and I will be re-installing the OS on a new hard drive. Of course, my original disk is a Service Pack 1. what order I should be downloading the Microsoft updates? Should I install Service Pack 2 first?
View 3 Replies
View Related
May 13, 2010
In windows xp how can i make applications run straight from the start -> run for example when i hit start - run and writing Nero it runs me automatically nero express how can i add personal shortcuts or to which directory should i copy the files in order that i should just write the name of the app and it will run straight 4 example if i'll write "skype" it will automatically open skype 10x always.
View 4 Replies
View Related
May 10, 2008
If you're like me have only dial-up or limited www access, order the CDs from MS.
View 4 Replies
View Related
Dec 21, 2004
I have always been able to "drag" sites I have in my favorites list to a position I wanted them, regardless of their name or ABC order or whether or not they were folders or individual sites, but all of a suuden my 98 system lists them in ABC order with the folders first and the individual sites following and I can't change it where they will stay where I move them to. Does anyone know what has happened or tell me where to go to change the setting to get this corrected? Seems like more view this XP forum than the 98 forim so I entered it in both.
View 1 Replies
View Related
Jan 21, 2005
I use COMPUPIC imaging software which allows me to create a slide show where I can change the order of the individual JPEG files in a directory. I can then copy these files into a new directory from within COMPUPIC and it retains the new ordering, not the original alphabetic ordering. So far everything is great. However when I then try to copy these files to a CD they are reordered alphabeticaly. I'm using Windows XP and Roxia CD Creator 5 Basic. This is a problem since I would like to use the reordered file on my CD player to create a slide show in the order I specified in my Compupic imaging software.
View 6 Replies
View Related
Mar 22, 2008
I'm looking for a way to sort out a list of stuff into alphabetical order.The list is in notepad, but i could put it in RTF if that would help.Or into wordpad.
View 6 Replies
View Related
Dec 7, 2007
I reinstalled XP Pro with SP1 on my computer today. Everything is working well except when my desktop loads the actual display is about an inch to the right on the screen. If I go into properties and change/apply the screen resolution from 800 x 600 then back to 1024 x 768 it realigns and all is well. I would just prefer to not have to do that each time I restart windows.
View 4 Replies
View Related
May 11, 2010
Before my latest power supply, when my computer booted, it would show the Welcome screen, then play the boot-up sound, then load the desktop. Now there is no boot sound cue until after the desktop loads. Is this something to be concerned about?
View 1 Replies
View Related
May 22, 2005
my friend has a gateway with operating system 2000..he is a complete novice and messed up his system..No virus protection.Basicly about all he can do is email and send cards..99% of the sites that he wants he's unable to get...My question is : Is it possible to get rid of his system and install a newer one and start from fresh? Thank you very much.
View 12 Replies
View Related
May 10, 2009
I'm in the final stage of building my WinXP Pro SP3 Desktop [Abit IP35 Pro MB, Intel E6600, 4 GB G. SKILL DDR2 RAM, 2 Seagate SATA II HD (500 GB & 1000 GB), SATA DVD-RW/BDROM, etc.]. Originally I had planned on using an U320 SCSI HD for System drive but gave up due to setup difficulties. Instead, I've installed a Western Digital Caviar Black, 640 GB HD that will become the System drive. This leads to my question: Is SATA port ordering important to device performance, i.e., should the WD HD be connected to Port 1? The MB has 6 SATA ports. Note also that: 1)
View 3 Replies
View Related