I used the premium upgrade version to upgrade my vista to 7 and loving it so far. With vista on the welcome screen it was alphabetical so with my name beginning with "A" my name was first, my parents who I start pff woith my mums name "L" 2nd and my sister "M" 3rd but since the upgrade the order changed and now I'm 3rd, my sister second and my parents first.
NOt so big a deal but I was use to the old order plus with my name being first I just had to hit enter and type in password now I'm too lazy to use the cursor to click on my name or the arrow keys to go to it hahaha nah but just was use to the old order and wow I've made a long post over something so dumb.
Okay so this is my problem; About two weeks ago my mother got to keep a laptop from work because she was moving schools and it was "outdated".It was on a school domain so it had her login from the schools.At the login page all i had to do was type "name.name" and the password and that was fine. She did not use the laptop anymore so she gave it to me.Even though she was a administrator i was getting sick of logining in as her all the time so i tried to create a new account. I want in to controle pannel and tried to make one but it came up with domain and user name. i tried to create a account but it was saying the rustrelationship with this domain and Lt-D-8JK12S. (the laptop) were denied.I went through another way to create a account through some workgroup thing , it worked. When i had to log on i would have to type Lt-D-8Qjk12Susername and password It only happened about two days ago that it started to have some problems.I could only log on to my account even though it had many different users in the laptops hard drive. it would say that i got my password wrong when i tried to type.the main problem is that i cant do anything because i am not an administrator and i kept being denied when trying making system changes and copy files on to a memory stick.
I have been working on a friends computer, trying to clean it up a little. I am logged onto the administrator account that he had set up, but it also shows it as a guest account and I can't do anything with the other accounts. I am trying to delete some of the standard user accounts that he doesn't want on it anymore and I can't do anything with them. When I try to create a new user account it shows "The specified account name is not valid, because account names can not contain the following characters:/[]";:|<>+=,?* Please type a different name"
When I boot my machine (Windows 7 Home Premium 64-bit) I get to the user accounts log in screen where it attempts to auto login and fails. I click the little "ok" button and see two user accounts, myself (BlackViper) and "Other" with no picture, and a blank for the password.I have no password on my account, but when I click on the icon associated with my account, it asks for one. I can leave it blank and log in just fine.I then "log off" and see three user accounts at the log in screen (Administrator), (BlackViper), and (Anawvyah). At this point I can access any of the three, and they all work just fine and the correctly associated pictures are there...
On my friends laptop, when she boots it up, it gets to the log-on screen and instead of having her account there, it's just the blank blue background and it doesn't say the Windows 7 bit at the bottom of the screen or have the shut down/sleep mode options and the cursor is in the middle of the screen, but it's not the normal cursor, it's larger and looks like the cursor from older versions of Windows. It is also frozen in place, and you can't move it. And when you close her laptop, it stays on instead of going black. We've tried looking it up already, but it's either just people having similar problems on other operating systems or people who are only missing some user accounts and can still log in on one. We're pretty sure it can't be a virus, because she scans her PC regularly with Avast, MalwareBytes, SUPERAntiSpyware and Spybot. (She also has McAfee, which came with her PC and when she tried to uninstall it, it made her computer bluescreen and then start frequently bluescreening randomly for a while, but soon stop)
My computer was a display model from a store. It had apparently been set up with a super administrator account. I had set up other administrator accounts and deactivated this account. I think I was trying to rename it because I had allowed remote access to some people I didn't trust and there was logon stuff left on my computer. But after that, my administrator accounts won't let me manage other useres. When I click on the screen, the selection box is blank. One the screens for my account, the image box is blank. I also lost access to all the files owned by the account that was deactivated, but I was able to give myself permission to view them. When I go to the command prompt and type users, the old account name is there. But when I try to activate it by issuing active/yes, I get a "can't find the file message."When I also turned on the administrator account, and it has the same issues as my current account.I think I should be able to manage other accounts,, so there must be some permission list somewhere that needs to be changed, but where and how? My next attempt will be to create a new account and try to copy the stuff my the deactivated one to that in the hope that it will give me a new account with the same super user privilege turned on. But that is a security risk that I would like to avoid if I can.
I don't know what I did but the main user account (and another) is missing at the login screen. I managed to create an administrator's account which is visible but I can't see the other user accounts at login or in the user accounts control panel. I've activated and verified that the missing user accounts are active by using net user "username" /active:yes command prompt. The user's folder's are still on the hard drive
I am a lab technician for Microsoft classes at a community college. One of our students somehow messed up his hard drive. The computer is running Windows 7 Enterprise SP1 64-bit. The system has two administrator accounts and one standard user account. I am still able to logon with those accounts and there are SID keys for each of these users in the registry.
Now when we create a new user, the account is created without any problems. The user shows up on the logon page and after running the net user command, it shows up there as well. When I try to logon with the new user, I get a message: The User Profile Service failed the logon. User profile cannot be loaded.
None of the new user accounts show up in the registry. The other anomaly that I see is that the Default User folder is missing in each of the Users subdirectory for the three accounts where I have no problems.
I have read the Microsoft Knowledge Base Article 947215 and none of the methods apply to my problem. I also checked Local Group Policies and the Do not logon users with temporary profiles setting is not configured.
I've been trying to change my user account picture in the control panel, it worked, and it showed up in the start menu, but it didn't change in the logon screen (still dell default icon).My system is Dell precision M6600, win7pro 64-bit. My user account has administrator right (in fact I am the only user).
I have an admin account, but it's the only account for my computer. I used to have plenty of old accounts, some of which were also admin accounts. When I decided to delete them, I chose to keep the files just in case. Now I realize I don't need them but it won't let me delete them.
I'm tired of my actions being blocked so I just want to leave the administrator account and delete the rest of them since I'm the only one on my pc. I can have only the admin account with these other accounts deleted without it causing any computer problems correct? I believe this is the case but I just want to make dang sure first.
A month or so ago I noticed I could not listen to Cartalk (A PBS radio show) online when I always could before. Tried to troubleshoot. Reset IE8 and still no joy. It works just fine with Google Chrome so I know it is related to IE8.
Just created a new account (standard vs. my admin) and of course I can listen just fine on that account. Again tried to troubleshoot. Looked at add-ons. Made them identical, still no joy. Once again completely reset IE8 and still nothing.
So why would the website work just fine with the standard account and not my admin account? This is driving me crazy. I know I can use the standard account or chrombut I really want to know why this is happening.
not all my user accounts are showing it shows the user account of the last person that logged in and then it shows other user then when i click on it i have to type my user name and password in i dont want other users to show up just all the accounts
when i boot up i go straight into windows i dont have no user accounts to login too, but this am i booted up my laptop and was faced with 3 user accounts ? _admin ime_user and the account i created shut the ?uck up both admin and user wont let me login says wrong pasword and my account has no password so that lets me login so where did the admin and user accounts come from and why are they showing up now ?
I have a laptop with Win 7 Home Premium, and one user account with administrative rights. Now, I would like to add two standard user accounts. How would I do that?I have experimented with copying over User files and folders, but I have really no idea what I should copy, if anything at all.
I'm having problems with creating new user accounts, admin or otherwise. Login works fine, but icons are all generic and windows explorer turns up the "page failed to load" error. In contrast, my regular admin acct works perfectly. I noticed this after a hard shutdown but am unsure there is a connection. I performed a system restore from an earlier restore point from before the unsafe shutdown but no luck.
I want to merge my account into the main administrator account. The main Admin account is basically untouched and can be overwritten in the case of any conflicts.My current account is also an Administrator account. I'm trying to move it to the main one to be able to bypass the login screen. I can not delete the other Admin account because it is the main one and does not have the "delete account" option (however the Admin account I use and have all my files on does have the "delete account" option)
I don't share my notebook with anyone, so I'd like to consolidate my user accounts, if practical:Administrator Admin Chuck "Chuck" is the only one I use and AFAIK has all the admin rights as the default, but could be wrong.
Recently I deleted an account that seemed to be automatic with Windows 7. It was not one that myself or my husband set up, but on that seemed to be administrator-type. I don't recall if it required a password. Anyway, I had no idea what it was for so I deleted it. Since then, I have noticed that windows is not working as well and I have a lot of issues with different webpages (even popular ones like Google & Facebook).Any idea what it was and how to get it back
How do I setup remote login that would allow 3 or 4 people to login to the same computer.Each person would have their own Windows User Account name, with different privileges.I don't know what software could do this. Could I please have some recommendations? The computer being connected to would be Windows 7, and there is no special network equipment besides a consumer router.This is a very small business and keeping costs under control is important
OS Version: Microsoft Windows 7 Home Premium, Service Pack 1, 64 bit Processor: Pentium(R) Dual-Core CPU E5300 @ 2.60GHz, Intel64 Family 6 Model 23 Stepping 10 Processor Count: 2 RAM: 6109 Mb Graphics Card: Intel(R) G45/G43 Express Chipset, -1265 Mb Hard Drives: C: Total - 938406 MB, Free - 886307 MB; Motherboard: Gateway, EG43M iAntivirus: Microsoft Security Essentials, Updated and Enabled
My computer suddenly tells me it can't open my pictures on one of my user accounts by asking what file do I want to use to open it or to go online to search for an opening file. I tried to start a new user account, and I'm told I need to tell what file I want to use to complete and open this account.
I can't login in Guest user. My administrator account is working properly and without any problems, but my guest account doesn't. When I login to that account then its automatically logging off and coming back to the login Screen.I created standard user, but anyway I can't login there. When I click the icon it automatically logs off.
I was trying to setup password and must have clicked on adminstrator rights and now I'm locked out and the area is greyed out the keys that say yes when i want to setup advanced user accounts setup.. IF I could at least get into restore i could set the pc back. but it says do you want to make following changed to computer but the yes is greyed out.
I have a laptop from my employer that I want to return as my contract is ending. However I am keen to ensure that I delete all my personal info as I also have work for another contract on it which is quite commercially sensitive (unfortunately I had a period when income would not allow me to have a second machine to keep everything separate). Naturally I have transferred everything I want to another machine and so that is safe.I have deleted everything I want to from the (dell) laptop, and used CC cleaner to wipe the free space, but I note that there is a file still left in one folder with a name that refers to the other company. If the first company sees that name they may think I have leaked info to a competitor and not want to offer me another contract later this year. I have tried all I can to delete the file but I get an error message saying it can't be located (0 bytes) which I assume is because I have already deleted it. I have tried logging off / on 10 times and tried to find the file but of course it is not actually there. I have two questions, how can I delete this ghost file, and / or how can I delete my User Account so that when I return the machine, nothing can be recovered? Of course because it's a company machine, although I have admin rights as I need to be able to install programmes etc; I may not have Full rights. I have tried to add another user so I can log on as that user to remove my existing account, but I get an error message about Trust accounts.
I was cleaning out my computer and deleting the inactive accounts, setting up the guest account, enabling parental controls, etc.When I was finished, I had two administrator accounts (mine and my mom's) and we were going to set up a guest account with parental controls. As I went to do this, I was prompted to set up a password for her account. I clicked "Add new password," but when I did this it password protected the account without me even adding a password? So I signed out of my account to go to my mom's side, but I couldn't access it because there was a password!! But really that password didn't exist, so I went back to my account to remove the "password." After signing out of my account once again, I was able to go into her account which had then turned into a temporary account (no clue how that happened). So I went to switch accounts but the only accounts visible in the Startup screen are her's (which is still a temporary account) and an account titled "Other User" which requires a username + a password -- mine is completely gone.So when I'm in my mom's (temporary) account I can still access the control panel and My Computer, which shows that the accounts do exist!! And so do all of their files!! So all I need to do is get them to show back up in the Startup menu?
OS Version: Microsoft Windows 7 Home Premium, Service Pack 1, 64 bit Processor: Pentium(R) Dual-Core CPU E5300 @ 2.60GHz, Intel64 Family 6 Model 23 Stepping 10 Processor Count: 2 RAM: 6109 Mb Graphics Card: Intel(R) G45/G43 Express Chipset, -1265 Mb Hard Drives: C: Total - 938406 MB, Free - 886307 MB; Motherboard: Gateway, EG43M iAntivirus: Microsoft Security Essentials, Updated and Enabled
My computer suddenly tells me it can't open my pictures on one of my user accounts by asking what file do I want to use to open it or to go online to search for an opening file. I tried to start a new user account, and I'm told I need to tell what file I want to use to complete and open this account.
I have windows 7, one thing I have trouble with is getting individual accounts to act as individual accounts. I want to have a user account for me and one for my wife. I want each one to have their own google chrome browser and their own google drive accounts. I may in the future want to download programs on one or the other user account without them showing up on both accounts. I think I may have messed up when setting up and made the admin my account rather than having an admin account plus two other user accounts, one for me and one for my wife.
I got a second-hand PC with windows 7. I deleted the previous owner's accounts and created new ones called Owner (regular) and Owner-admin (admin access). Since then everything is messed up..The previous owner account still had files in /users/[account name]/ after I deleted the account. I deleted those and they were mostly gone, but some are protected or are recreated on reboot. Even though I always log in as Owner, downloaded files often en up in the previous owner's "My documents/downloads". When I try to copy them into my new "My documents/downloads", I don't have write permission. I can't write into my own user account directories...? I thought I'd recreate the previous owner's account and try to undo it from the inside out, but ended up with a Owner.Carl-VAIO.Carl-VAIO' as well as aOwner.Carl-VAIO' account. I tried to install Thunderbird, but it is so confused about what is what that it won't install. I can't blame it.
After it was already too late I discovered that my computer thinks it is part of a workgroup. I tried to reset this (it's a standalone), but I couldn't - the button remained greyed out no matter what. Not sure if that has anything to do with the problem.What can I do, other than re-install the OS with an installation CD I don't have?
Now this is the first time that i have loaded a 2nd profile on my laptop. I have the same version on my desktop and it works without any issues. But on my Sony Vaio laptop i cannot get fast user switching to work at all. I have worked ont his for 2 days now. Ive tried all the forums and all the little hacks for regedit,gpedit...etc etc. Nothing is working.... does anyone out there have a fix for this or am i just doomed to have to log off when i want to switch accounts?
I am setting up multiple machines to run Windows 7 on my home network. I would like the users to have the same profile settings regardless of the machine they log into. Can user profiles be synced between machines within the same homegroup?If not, during the setup of the user, can I copy user preferences/profile settings so when they log in for the first time they don't have to reset everything?